6,000 sq ft spread across 3 floors. 28 tonnes of air conditioning. A 20 kVA UPS and a 100 kVA DG set backing up lighting, computing, and a small on-site data centre — with ~5,000 units/month consumption, improper cooling distribution, and heat incidents triggering unplanned DG runs. SEnergy IoT delivered a 42-day turnaround with ~40% annual savings.
A site survey identified the energy guzzlers. Smart energy meters and monitoring hardware were installed and networked to the SEnergy Cloud.
Overall distribution was re-engineered through optimal deployment and rewiring. Specification of distribution components and end equipment was corrected, as was the lay-out of the power-backup system.
Workspace layout altered to match space-tonnage index. Ventilation elements introduced to improve heat exchange and air circulation. More ACs added where tonnage was deficient.
The conservation project was executed within 42 days end-to-end — a planned, measured, instrumented turnaround from survey to go-live.
30-minute walkthrough. UPS/DG optimisation, HVAC monitoring, and earth-fault alerting for IT campuses and office backbones.